RATP Metroline 7, 8 and 13

Retro-fit, function addition & wiring

  • Train builder

  • Operator

 
 
For RATP Paris metrolines 7, 8 and 13, relay blocks for door opening and closing as well as general speed control and braking were developed for new trains as well as existing trains with additional functionalities. The solution contributed to time reduction of trains between stations and met increasing passenger traffic demand.
 
The project consisted of ready-to-install relay blocks inside the trains, integrating two blocks: One for timing and one for control into one timing relay block to reduce space and adding extra functionalities on existing trains.
 

Installation

Mors Smitt provided a cost effective package of new and retrofit solutions including blocks assembly, wiring and functionality tests ready
to install by RATP technicians.

Design

3D design of panel


Unique features

R&D for integration of timing board and relay function into one relay block unit for new
and retrofit applications.

 
Use of ultra reliable safety critical relays B and C type for door, speed, and breaking
control.

 
Relay blocks validated and ready to install for fast installation and easy
maintenance.
Scope of RATP Metroline 7, 8 and 13 project:
Project duration
2008 - 2015
No. of panels
435 blocks
B400 and C relays
3.960 relays
Length wiring
15 km
R&D & assembly time
1.800 hrs
 
 

 

 
 
 
Contact directory of Mors Smitt
 
Download the latest catalogs and brochures of Mors Smitt

Visit Mors Smitt during one of world wide exhibitions
 
Join the Mors Smitt mailing list and keep updated

Toolkit

                                                                                                                                         © Mors Smitt 2012